FSRU Project Development and Operation: Strategies and Best Practices
Introduction
The course offers a thorough analysis of the FSRU sector, covering many technical, project-specific, and business concerns related to the usage of FSRU regasification units.
Target Audience
This course is designed for:
- Technical, commercial, and management employees who need an in-depth technical knowledge of the LNG business and FSRU development. New technical support personnel entering the sector Technical personnel who want to learn more about the sector
Course Outline
Day 1: Introduction to LNG – what is LNG
- Some key facts about LNG, including physical properties, rich and lean LNG, composition ranges, safety, and flammability.
Day 2: LNG Global Trade and alternative Commercial Models
- Global Gas and LNG Trade Development of LNG Trade LNG Importing Countries The Global FSRU Fleet Gas Market Characteristics The LNG Contract Chain Sales and Purchase Agreements FSRU Chartering
Day 3: Technical Fundamentals
- LNG Properties and conversions Heating Values, Wobbe, Interchangeability, and market specifications
Day 4: FSRU vs Land Based Import
- CAPEX Schedule Permitting Port Restrictions Major
Day 5: Major FSRU Technology Choices
- Ragas Technology Selection Boil-Off Gas Handling/ Reliquefication LNG Pump Selection Topsides Layout Considerations
Day 6: FSRU Cargo Containment Systems
- Overview of liquefaction systems (membrane vs Moss vs SPB vs Type C)
Day 7: LNG Transfer
- Ship to Ship Transfer- side by side vs tandem Hard Arms vs Cryogenic Hoses HP Gas transfer vs hard arms and HP hoses Custody Transfer, Metering and measurement Small scale and bunkering
Day 8: FSRU Mooring System Designs
- Tower Yoke Systems Spread Mooring Offshore Island Jetty Mooring Gravity Based Regas structures
Day 9: Marine Infrastructure Issues
- Breakwater Design Port Dredging Tugs and Pilots FSRU Designs Newbuild vs Conversions Shipyard Selection Ship Designs (AtlanticMax, Q-max, Q-flex) Floating Storage (FSU’s) Floating Regas (FRU’s) Floating Gas to Power Niche FSRU Applications
Day 10: FSRU Construction & Constructability
- Long Lead Item Delivery Typical Conversion Schedule Typical Newbuild Schedule
- FSRU CAPEX and OPEX:
- Factors Influencing CAPEX and OPEX Typical OPEX Elements
- FSRU Site Selection Considerations:
- Metocean Water Depth Water Temperature Environmental Regulations
- Introduction to LNG Safety:
- Historical Incidents and Lessons learned – material selection, layout, stratification, rapid phase transition, other Safety in Design Safety Code requirements Introduction to Permitting and Environmental
Curriculum
- 10 Sections
- 0 Lessons
- 10 Days
Expand all sectionsCollapse all sections
- Day 1: Introduction to LNG – what is LNG• Some key facts about LNG, including physical properties, rich and lean LNG, composition ranges, safety, and flammability.0
- Day 2: LNG Global Trade and alternative Commercial Models• Global Gas and LNG Trade Development of LNG Trade LNG Importing Countries The Global FSRU Fleet Gas Market Characteristics The LNG Contract Chain Sales and Purchase Agreements FSRU Chartering0
- Day 3: Technical Fundamentals• LNG Properties and conversions Heating Values, Wobbe, Interchangeability, and market specifications0
- Day 4: FSRU vs Land Based Import• CAPEX Schedule Permitting Port Restrictions Major0
- Day 5: Major FSRU Technology Choices• Ragas Technology Selection Boil-Off Gas Handling/ Reliquefication LNG Pump Selection Topsides Layout Considerations0
- Day 6: FSRU Cargo Containment Systems• Overview of liquefaction systems (membrane vs Moss vs SPB vs Type C)0
- Day 7: LNG Transfer• Ship to Ship Transfer- side by side vs tandem Hard Arms vs Cryogenic Hoses HP Gas transfer vs hard arms and HP hoses Custody Transfer, Metering and measurement Small scale and bunkering0
- Day 8: FSRU Mooring System Designs• Tower Yoke Systems Spread Mooring Offshore Island Jetty Mooring Gravity Based Regas structures0
- Day 9: Marine Infrastructure Issues• Breakwater Design Port Dredging Tugs and Pilots FSRU Designs Newbuild vs Conversions Shipyard Selection Ship Designs (AtlanticMax, Q-max, Q-flex) Floating Storage (FSU’s) Floating Regas (FRU’s) Floating Gas to Power Niche FSRU Applications0
- Day 10: FSRU Construction & Constructability• Long Lead Item Delivery Typical Conversion Schedule Typical Newbuild Schedule
• FSRU CAPEX and OPEX:
• Factors Influencing CAPEX and OPEX Typical OPEX Elements
• FSRU Site Selection Considerations:
• Metocean Water Depth Water Temperature Environmental Regulations
• Introduction to LNG Safety:
• Historical Incidents and Lessons learned – material selection, layout, stratification, rapid phase transition, other Safety in Design Safety Code requirements Introduction to Permitting and Environmental0